ECO Material ENGLISH WEB PAGE
Product
Information
GCE System
EPOCA
Organic Fertilizers
ECO BATAKE
Corporate
Profile
Enquiries
Treatment Method and Performance

Features and Advantages

System Chart

Product Specifications
[Features and Advantages of EPOCA]

Treated waste is odor and germ-free.

Treated product becomes odor and germ-free in an incinerator with high temperatures and pressure. Infectious waste from hospitals can be treated safely.

Analyzed items Analysis results Criteria (for reference)*
Dioxins 0.00046ng-TEQ/g 3ng-TEQ/g or less
Alkyl mercury compounds Not detected (less than 0.0005mg/L) Not detected
Mercury or compounds thereof Less than 0.0005 mg/L 0.005 mg/L or less

• Test results by Public Health Research Center of Hokkaido Pharmaceutical Association
• Treated product analysis results by Hokkaido Center of Environmental Sciences and Technology Sciences and Technology
• Specimen: Industrial waste from the food retailing industry (mixed)
The Ministerial Ordinance Specifying the Standards for Industrial Waste Including Metals (Prime Minister’s Office No. 5, 1973)
* Disposal criteria for an industrial waste landfill



Creating something out of nothing
Increasing investment efficiency

Since the treated product is odor and germ-free, it can be used in a variety of ways to produce secondary manufactured goods. A wide range of recycled products can be produced by adding materials to treated product and using various processing methods. Commercializing these products and selling raw materials will increase profitability as well as contribute to the creation of a recycling-based society.

[Examples of commercial products]
  • Organic fertilizer
  • Feed
  • Pet food
  • Snow-melting agent
  • Plastic raw materials
  • Wood substitutes, etc.
*Treated product that does not need to be commercialized as products are treated as general waste.


Safety-conscious design

Every detail of the system is designed based on safety. The system even includes an incinerator resisting an atmospheric pressure of 30. It passed four difficult process tests – material test, groove test, x-ray examination and pressure test – designated by the Labour Standards Bureau.


Space saving and low-cost design

Operating procedure consists of four simple processes of waste input, pressurization/water supply, drying and removal. The number of operators required for this cycle is at least two including a boiler engineer.
Since treated product residues are odor and germ-free, there is no need to secure a specific site for installation . In addition, a spacious site is not required because of its simple structure.

* Based on calculations of the annual costs of contracting out waste treatment for an average supermarket, the costs for purchasing and installing the system will be recovered within several years; thus the contracting costs can be drastically reduced.

Copyright (C) 2006 ECO Material. All Rights Reserved.